United States
Jeffrey Berman Architects Projects
NewYork-Presbyterian Brooklyn Methodist Hospital
Brooklyn, NY
Construction Management
Healthcare
When NewYork-Presbyterian Brooklyn Methodist Hospital decided to upgrade their compounding pharmacy to meet the updated USP797 Pharmaceutical Compounding – Sterile Preparations and USP800 Hazardous Drugs standards, the challenge for our LF Driscoll Healthcare team was building a plan that would allow the pharmacy to continue operating during construction. The project involved installing new robotic compounding equipment, replacing the current robotic packaging equipment with new equipment, updating delivery systems, and installing a new rooftop AHU.
