United States
SMBC Aviation
28 Fitzwilliam, which is the new home to SMBC Aviation Capital, forms part of the landmark development on the historic site of the former ESB offices in the heart of Dublin’s Georgian Quarter. SMBC Aviation Capital, Ireland’s largest aircraft leasing company and the world’s second largest aircraft leasing company, engaged Structure Tone to fit out a new state-of-the-art HQ office space.
Spanning eight floors, this impressive 135,000sf space features a new double-height auditorium and all-hands space that’s visible from the central circulation core and connects the main working spaces across the third and fourth floors. For the first time, these elements are distributed across two floors—a central feature of the design meant to foster a sense of connectivity within the workspace. The unique reception area features a high-level installation representing the rich cultural heritage of the company through its reference to both Irish and Japanese folklore.
The facility also includes an advanced lab for testing aviation fuel, executive meeting rooms on level six, a fully catered canteen, numerous micro kitchens, open-plan desk spaces, boardrooms, and a bespoke fully equipped gym.
Highlights Include:
- High-end fast-track project completed in 28 weeks
- Level 6 high specification executive meeting rooms and breakout space
- Level 5 catering kitchen and breakout areas to accommodate 100 seats
- New auditorium structural steel bleacher and perimeter glazed balustrade
- Installation of new gym and shower rooms in the lower ground floor
- Specialist custom joinery packages
- Coordinated and managed specialist integrated A/V system
- Modifications and installation of new M&E systems
- Installation of perimeter offices and conference/meeting areas
® DonalMurphy Photography
Architect
Henry J Lyons
Client
SMBC Aviation
Location
28 Fitzwilliam Street Lower
SF
135,000sf
Contract
RIAI Yellow Form
Architect
Henry J Lyons
Owner's Rep
Turner & Townsend
Project Engineer MEP
Ethos Engineering
Quantity Surveyor
Turner & Townsend
Awards
LEED Gold Certified
Client Quote
The program was painfully tight, but having Structure Tone as the center of communication for all the moving parts made us more comfortable,” explains Shane Carroll, SVP Strategic and Market Analysis at SMBC. “We made our first day of business and came in under budget.”
No. of weeks to complete the project
28 weeks