United States
Building & Site Evaluation Projects
Prologis Ports Jersey City
Jersey City, NJ
Building & Site Evaluation
Industrial
A former Superfund landfill redevelopment, this project had a two-year break between phases before base construction.

Prologis Ports Jersey City
Jersey City, NJ
Building & Site Evaluation
Industrial
Amazon DEN4 Non-Sortable
Colorado Springs, CO
Building & Site Evaluation
Industrial
Our RC Andersen team went vertical with one of the nation’s first multi-story, robotic hub of its kind in Colorado.

Amazon DEN4 Non-Sortable
Colorado Springs, CO
Building & Site Evaluation
Industrial
Goya World Headquarters
Jersey City, NJ
Building & Site Evaluation
Industrial
We have our part in building the future of food with Goya’s world headquarters. This Jersey City ground up industrial food distribution center included on-site improvements to the 42-acre property comprised of a 13.

Goya World Headquarters
Jersey City, NJ
Building & Site Evaluation
Industrial
Spotswood Logistics Center
Spotswood, NJ
Building & Site Evaluation
Industrial
A former manufacturing facility, this ground up construction involved extensive demolition with asbestos abatement and a speculative warehouse including office space and primary power service.

Spotswood Logistics Center
Spotswood, NJ
Building & Site Evaluation
Industrial
Arsenal Trade Center
Sayreville, NJ
Building & Site Evaluation
Industrial
This project included a full sitework package that was developed on a 73-acre site. Building trades were sequenced to work continuously to limit remobilization cost and sequenced to minimize the overall construction schedule.

Arsenal Trade Center
Sayreville, NJ
Building & Site Evaluation
Industrial
Innovation Pointe
Lehi, UT
Building & Site Evaluation
Corporate Base Building
Innovation Pointe is a multi-phase, high-tech office campus consisting of four five-story buildings. Major sitework was required to accommodate the massive campus infrastructure.

Innovation Pointe
Lehi, UT
Building & Site Evaluation
Corporate Base Building

University of Hawaii at Manoa Life Sciences Building
Honolulu, HI
Building & Site Evaluation
Academia, Education, Life Sciences
In collaboration with architect G70, Layton Construction led a design-build project for the University of Hawaii at Manoa’s Life Sciences Building. The process began with a demolition of the university’s existing structure, Henke Hall, and the removal and replacement of contaminated soil for the new facility.

University of Hawaii at Manoa Life Sciences Building
Honolulu, HI
Building & Site Evaluation
Academia, Education, Life Sciences

Free Library of Philadelphia, Parkway Central Branch
Philadelphia, PA
Building & Site Evaluation
Cultural/Religious
Free Library of Philadelphia, Parkway Central Branch Renovations When renovation plans began in earnest in 2006, the Parkway Central Library building was only 35% accessible to the public. Today, 68% of the building is now usable with 41,000sf of new community space developed in the area that previously housed the library’s impressive book stacks.

Free Library of Philadelphia, Parkway Central Branch
Philadelphia, PA
Building & Site Evaluation
Cultural/Religious

The Philadelphia Museum of Art Core Project
Philadelphia, PA
Building & Site Evaluation
Cultural/Religious
The Philadelphia Museum of Art Core Project Since 2004 we have been partnering with the team at the Art Museum to conduct numerous renovations as part of their master plan to modify and renovated the historic building, and we were delighted when they trusted us with executing the latest and most delicate phase of Frank Gehry’s Master Plan - known as the Core Project - for the historic landmark museum.

The Philadelphia Museum of Art Core Project
Philadelphia, PA
Building & Site Evaluation
Cultural/Religious
