Structure Tone partnered with M Moser Associates to deliver a dynamic, hospitality-inspired workplace for a confidential client in Manhattan. Spanning two floors, the space features a hotel-lobby feel, interconnecting staircase, wellness amenities, and a 20x20 ft ultra-HD LED wall. The...
Read More
After a successful 7th floor refresh, LiveRamp turned to Structure Tone for a 10,000sf interior fit-out on their 9th floor. The open floor plan fosters collaboration and features a welcoming reception, green-accented conference rooms, modular breakout spaces, and a high-end...
Read More
Structure Tone managed a multi-phase tenant improvement for a confidential financial services client, transforming over 110,000sf across six floors. The project delivered high-performance workspaces, a vibrant amenity floor with a barista station, upgraded IDF rooms, and modern finishes—creating a cohesive,...
Read More
Serving as construction manager, Structure Tone completed an extensive two-phased, 255,000sf renovation project for the illustrious St. Regis New York Hotel. Phase 1 consisted of comprehensive upgrades to the lobby, adjacent F&B spaces, model rooms, and corridors, while Phase 2...
Read More
Situated East of Washington Square Park, NYU’s College of Arts and Sciences underwent a significant redevelopment initiative encompassing a complete overhaul of its infrastructure and aesthetics. Structure Tone did a thorough gut renovation and fit-out of floors 2-6, alongside extensive...
Read More
Structure Tone provided construction management services for the New York Mets’ (NYM) corporate offices at Citi Field. The 5,500sf, known as “The Hub,” serves as a social, dining, and event space for the NYM employees. The baseball design concept is...
Read More
High above the streets of Lower Manhattan, a new rooftop destination has arrived - vibrant, stylish, and built for all seasons. Conrad New York Downtown has introduced Leonessa, a lively Italian-inspired cocktail lounge that replaces the former Loopy Doopy Rooftop...
Read More
Structure Tone provided construction management services for the New York office relocation of Atlanta-based law firm, which involved the 35,000sf fit-out of a new, unoccupied single-floor space. The project included a variety of spaces such as general office areas, executive...
Read More
February 27, 2025
in
Share
Structure Tone provided construction management services for the reconfiguration of the 26th and 27th floors of Duolingo’s new NYC offices, transforming the space into an open, collaborative hub for over 200 employees. The new layout was designed to accommodate a...
Read More
Cosmetic giant Revlon relocated their executive offices from Midtown to the top two floors of One New York Plaza. Sitting atop the southernmost tip of Manhattan, the office features spectacular panoramic harbor views of Governor's Island, the Statue of Liberty,...
Read More