Fiserv
Fiserv has leased just under 70,000sf in Ten Hanover Quay, a historically significant and protected in Dublin’s Docklands. Over the last year, the innovation-focused company partnered with their trusted construction partner, Structure Tone Dublin, to transform the recently renovated structure into Fiserv’s Irish headquarters.
The project included a full M&E upgrade for the entire building, a working pantry on every floor, and a full-service café on the first floor, featuring tiered seating extending into the basement. New structural stairs connect the ground floor to the first level. Two of the five upper levels were dedicated to Fiserv’s partner, AIB Merchants, showcasing the AIB floors feature the company’s own unique branding and design.
According to the Structure Tone team, one of the most extraordinary aspects of the project was the fifth floor. As the building’s penthouse, the fifth floor offers 360-degree views of the Dublin Docklands and a spectacular vantage point to watch the sunrise.
Sustainability
Another defining characteristic of the job was Fiserv’s focus on sustainability. Although the goal was to pursue LEED certification, the project was not initially designed and spec’d with LEED in mind, requiring the construction team to adapt retroactively.
To achieve LEED certification, the team went above and beyond to earn necessary number of LEED credits. For instance, the mechanical, electrical, and sanitary packages had to be adjusted to meet the required flow and flush rates. During construction, toilets and faucets were modified, and the Structure Tone used flow restrictors to ensure compliance with LEED standards. Additionally, the team repurposed more than 60% of the building’s existing AHUs and ductwork, helping Fiserv’s new space achieved LEED Gold.
COMPANY
sectors
services
Architect
Henry J Lyons
Client
Fiserv
Location
10 Hanover Quay, Dublin
SF
70,000sf
Architect
Henry J Lyons
Project Engineer
Ethos Engingeering
Owners Rep
KMCS
Quantity Surveyor
KMCS
Contract Type
GC
Certifications
LEED Gold
Awards
Shortlisted for large office fit out 2023 Fit Out awards
No. of weeks to complete the project
18