Offices | Currently Browsing: USA
back Button
Mount Sinai Morningside, Babcock Building Med-Surgical Unit - STO Building Group
Structure Tone is a global leader in construction management and general contracting services with offices located in the US, UK, and Ireland. Founded in 1971, the company is among the world’s top twenty construction companies worldwide, responsible for more than $3.5B in annual construction volume.
37553
projects-template-default,single,single-projects,postid-37553,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-6.4.1,vc_responsive
Slide background
Slide background
Slide background
Slide background
Slide background
project

Mount Sinai Morningside, Babcock Building Med-Surgical Unit

Ongoing advancements in medicine and technology means medical facilities are constantly adapting—which, in turn, means completing construction projects in busy hospital environments. That was the case for this 12,000sf gut renovation of the fourth floor in a busy urban hospital, where communication and coordination were key. Above the project site resides the adolescent inpatient psychiatric wing. Below the project site is a fullly operating suite with operating rooms, post-op, and adjacent sterile areas. Our LF Driscoll Healthcare team worked closely with hospital staff to minimize disruption and employed flexible scheduling at night and on weekends to work around critical hospital functions.

The renovated floor will provide a new medical surgery unit with 15 private rooms and dialysis capability. Among the rooms are two VIP and four negative pressure rooms. The team station area will have Epic Monitoring, a pneumatic tube station, and staff and support spaces. Infrastructure systems include modular headwall systems, mechanical infrastructure improvements, a new dedicated air handling unit on the floor, and inline exhaust fan to the louver. Our team orchestrated multiple shutdowns to the active and surrounding areas to coordinate full electrical shutdowns of critical power, equipment power, and normal power, all of which were successfully coordinated with hospital staff.

On top of these built-in challenges was the onset of COVID-19. As essential workers, it was vital that we kept both the construction moving and the hospital functional, and we all worked together to implement protocols for safety on the fly, reacting in real time as the situation demanded.

®Photography Credit Colin Miller Photography

Client

Mount Sinai Health System

Address

1111 Amsterdam Avenue

Location

New York, NY

SF

12,000sf

Architect

HKS

Contract

CM