United States
Blueface
Structure Tone recently completed the fit-out of the new Blueface (a Comcast Business Company) corporate headquarters at Number 2 North Dock, Dublin 2. The fit-out is 15,000sqft with high-end finishes.
The floor plan consists of an open office space that is divided into collaboration spaces, phone booths, casual/formal meeting rooms, and a specialist project room encased with bespoke, curved glazing. The Café / All Hands area was generously proportioned and incorporated a full working kitchen, bespoke booth seating, and a pool table for employee downtime. Upon entering, guests and workers alike are greeted by the reception desk topped with an illustrious, blue granite stone from Brazil called the Azul Bahia. The last touches of the project consisted of fitting out the executive meeting rooms with a state-of-the-art AV system that allows for seamless business operations with their US partners. A special feature of this area was the intricate folding wall system which transforms the three executive meeting rooms into one large collaboration space.
Architect
MOLA
Client
Blueface, a Comcast Business Company
Location
Nr 2 North Dock Dublin, Ireland
SF
15,000sf
Contract
CM
Architect
MOLA
Project Engineer
Axis Engineering
Owner's Rep
Savills
Quantity Surveyor
Andrew Nugents